We use cookies and similar methods to offer the best experience to all visitors and to remember their preferences. Please take a moment to review our Privacy Policy. By tapping “accept”, you consent to the use of these methods.

SMI - GERAL Q2 2026
+2.59 % 299.81
=
INCOME RETURN
+2.27 % +
APPRECIATION RETURN
+0.32 %
USD / MXN
0.00 % 17.97
GDP (Quarterly, Millions)
-1.24 % 29,325,765.23 PTS
CPI
0.00 % 3.26 PTS
Reference Rate
0.00 % 6.50 PTS
Closing IPC
0.00 % 65,312.46 PTS
UDIs
0.00 % 8.85 PTS

LEGO’s Largest Factory Will Grow Less Than Its Capacity in Monterrey

  • LEGO has spent two decades expanding the same plant in Monterrey, but each new phase required something different from the industrial space it occupies.

Nancy Sánchez Moya leads LEGO’s operations in Mexico, including its largest factory, in Monterrey. Photo: SiiLA.
Nancy Sánchez Moya leads LEGO’s operations in Mexico, including its largest factory, in Monterrey. Photo: SiiLA.
By: SiiLA News

LEGO’s largest factory in the world is in Monterrey, and it is still growing. Over the next few years, the company will expand its footprint by about 20%, but expects to increase production capacity by 35%. To do so, it will add 62,000 square meters for operations including packaging and automated storage.

The new expansion is not starting from a static plant. Between the second quarter of 2023 and the same period of 2026, the industrial space occupied by LEGO and tracked by SiiLA increased by about 31%, from 240,000 to 315,000 square meters. The nearly 75,000 additional square meters ranked the company 30th for space added among 4,466 companies present in both periods and, within the Consumer Products sector to which it belongs, represented the largest expansion among 97 comparable companies.

The current scale is difficult to recognize in the plant where LEGO began production in Monterrey in 2008. At the time, it operated one building and five packaging lines and employed 178 people. By 2022, the complex had grown to six buildings, 100 packaging lines and 769 molding machines, while its workforce had reached about 5,000.

That growth also changed the type of space the operation required. Processing, molding, and automated storage areas were added to production and packaging space, functions that have reappeared in successive expansions of the complex.

By 2025, that infrastructure could produce about 200 million pieces a day using more than 1,200 injection-molding machines. If that pace were sustained for a year, it would amount to about 73 billion elements, nearly 1.8 times the 41.6 billion bricks LEGO estimates it would need to recreate the Eiffel Tower at full scale.

Latam
Mexico
Nuevo Leon
Industrial
Market Analytics
Investments

ABOUT SiiLA

Founded in 2015, SiiLA is the industry leading REsource for comprehensive commercial real estate market insights, news and events across Latin America. The SiiLA suite of innovative products drive greater accuracy, efficiency, and strategic advantages for top players in the commercial real estate industry.

Nearshoring

Lorenzo Berho leads Vesta, which delivered one of the largest industrial buildings in Q1 2026, totaling more than 67,000 sqm. Photo: SiiLA.
How Can the Boom End Without Ending the Expansion?
Adilson Formentini leads Tramontina Mexico, whose first assembly plant in the country opened in the State of Mexico during Q1 2026. Photo: SiiLA.
Mexico Attracts Companies, Not Necessarily New Industries

Trusted by Leading Publications

Exclusive Access

Join our mailing list for Real Estate News, Events, Insights & Resources.

SiiLA News on Mobile - Stay Updated Anytime, Anywhere. Read Latest Real Estate News from your phone